A production floor you can see from the office in real time.

We connect machines, people and ERP into one picture of production. The shift supervisor sees downtime before it turns into a late order.

What usually doesn’t work

  • OEE calculated once a month

    Metrics come from manual reports, so you learn about a problem after the fact.

  • Paper job cards

    Order times, scrap and changeovers are written by hand and retyped into the ERP.

  • Knowledge in operators’ heads

    Work instructions and machine failure history are not available at the machine.

MES systems, live machine monitoring and OEE, integrations with ERP and PLCs.

This is what it could look like for you

A simplified, working part of a system we build for companies in this industry. Try it out.

Bottling line L2, morning shift

What we build for companies in this industry

We combine modules into one system or roll them out one by one, starting with what brings the fastest result.

  • Machine monitoring and OEE

    Signals read from PLCs and sensors, availability, performance and quality calculated live.

  • Operator terminals

    Start and stop an order, report downtime or scrap with one tap on a tablet.

  • Production planning

    Order queues per work centre, accounting for changeovers and material availability.

  • Maintenance

    Preventive inspections, breakdown reports and the history of every machine.

  • Traceability

    Full batch genealogy: raw material, machine, operator, inspection result.

  • ERP integration

    Two-way exchange of orders and output with Comarch, Symfonia, SAP and others.

How we start

  1. 1

    Call and workshop

    An hour-long call, then a workshop with your team. We map processes, problems and what will bring the fastest result.

  2. 2

    Figma prototype

    A clickable design of the key screens that you test with staff or customers before any code is written.

  3. 3

    First version in 8–12 weeks

    We build in two-week sprints. After each one you see a working part of the system.

  4. 4

    Launch and growth

    Training, data migration, support and further modules by priority.

Industry questions

Do we have to replace machines to monitor them?

No. Older machines connect through simple I/O modules or current sensors, newer ones through OPC UA or Modbus.

Where is the data stored?

On a server in the plant, in the cloud or hybrid. The choice depends on your security policy.

Does the system work with our ERP?

We integrate with the most popular ERPs in Poland through an API, the database or exchange files.

Show us how you work today. We’ll suggest what to change first.

Tell us briefly what you do and what you want to improve. We reply within one business day with a proposed time for a call.

Book a free consultation